Prologis Park Eskilstuna DC2, which is 23,085 square meters, was completed in 2017. The building has a clear height of 11.7 meters. The floor has a maximum floor load capacity of 3,500 kg/m2 distributed load and 5,500 kg point load. Prologis aims to have the facility certified as a green building. There is the option to expand the facility by 10,000 to 20,000 square meters. The property is equipped two automated storage systems and a solar cell facility of 1,557 square meters, which generates up to 124,612 kilowatt hours per year.
Within a distance of 100 kilometers, 3.5 million people can be reached from Prologis Park Eskilstuna, representing 35 percent of the Swedish population. Eskilstuna functions as a last-mile location for the entire region of Stockholm. The infrastructure consists of a highly developed road network, railway routes that connect throughout Europe and a dry port at Södertälje.