Prologis Park Eskilstuna DC3, with over 16,500 square meters total area, is planned for completion in the beginning of 2023. The building has a clear height of 12.2 meters. The floor has a maximum floor load capacity of 5,000 kg/m2. Prologis will have the facility BREAM certified and prepared for solar panels.
Within a distance of 100 kilometers, 3.5 million people can be reached from Prologis Park Eskilstuna, representing 35 percent of the Swedish population. Eskilstuna functions as a last-mile location for the entire region of Stockholm. The infrastructure consists of a highly developed road network, railway routes that connect throughout Europe and a dry port at Södertälje.
Lagerlayout
DC3 |
Lager: 15 209 m2 |
Kontor: 423 m2 |
Mezzanin: 1 166 m2 |
Totalt: 16 798 m2 |
Klar i Januari 2023 enligt plan |
Specifikationer
Lager:
- Fri höjd: 12,2m
- Pelarfördelning: 12x24
- Sprinklersystem
- Maximal golvbelastning: 5 000 kg per m2
- Maximal mezzaninbelastning: 500 kg per m2
- Lastportar: 7
- Takskjutsportar: 1
Kontor:
- Fjärrvärme
- LED-belysning
- BREEAM – miljöcertifiering för byggnader
- Förberedd för solpaneler
Kontakt
Andreas Berggren
Leasing Manager
+46 (0)705-528354
[email protected]